Testing For Continuity

2007 Dodge Magnum SRT-8 V8-6.1L VIN 3SECTION Testing For Continuity





STANDARD PROCEDURE - TESTING FOR CONTINUITY




1. Remove the fuse (1) for the circuit being checked or, disconnect the battery.

2. Connect one lead of the ohmmeter to one side of the circuit being tested.

3. Connect the other lead to the other end of the circuit being tested. Low or no resistance means good continuity.
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • You smell fuel, burning insulation, or see smoke.
  • Brakes feel soft, pull hard to one side, or make grinding noises.
  • The engine overheats, stalls repeatedly, or misfires under load.
  • You are missing required tools, torque specs, or safe lifting equipment.
  • You are not confident in the next step or safety outcome.