Installation Procedure

2025 Chevrolet Tahoe PPV, 4WDSECTION Installation Procedure
  1. GM6697450Courtesy of GENERAL MOTORS COMPANY

    Install the power steering control module torque sensor wiring harness (1).

  2. Install the power steering control module torque sensor wiring harness clip (2) to the electric belt drive rack and pinion steering gear housing.
  3. Connect the power steering control module torque sensor wiring harness (1) to the power steering assist motor.
  4. GM5024240Courtesy of GENERAL MOTORS COMPANY
    NOTE:

    Some components not shown for graphic clarity.

    Connect the power steering control module torque sensor wiring harness (1) to the electric belt drive rack and pinion steering gear.

  5. Install underbody panels as necessary. Underbody Panel Component Locator
  6. Connect the battery negative cable. Battery Negative Cable Disconnection and Connection (9C1 / 5W4) , or Battery Negative Cable Disconnection and Connection (KL9)
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • You smell fuel, burning insulation, or see smoke.
  • Brakes feel soft, pull hard to one side, or make grinding noises.
  • The engine overheats, stalls repeatedly, or misfires under load.
  • You are missing required tools, torque specs, or safe lifting equipment.
  • You are not confident in the next step or safety outcome.