A/C Low Pressure Switch Replacement

2001 Chevrolet Express 1 Ton Van V8-5.7L VIN RSECTION A/C Low Pressure Switch Replacement
REMOVAL PROCEDURE




1. Remove the coolant reservoir.
2. Disconnect the electrical connector from the A/C low pressure switch (4).
3. Remove the A/C low pressure switch (4) from the accumulator (2).

INSTALLATION PROCEDURE




1. Using a lint-free clean, dry cloth, carefully clean the sealing surfaces of the liquid line fitting.
2. Lightly coat the new O-ring seal with mineral base 525 viscosity refrigerant oil.

IMPORTANT: DO NOT allow any of the mineral base 525 viscosity refrigerant oil on the new O-ring seal to enter the refrigerant system.

3. Install the new O-ring seal (3).

NOTE: Refer to Fastener Notice in Service Precautions.

4. Install the A/C low pressure switch (4) to the A/C accumulator (2).

Tighten
Tighten the switch to 6 N.m (53 lb in).

5. Connect the electrical connector to the A/C low pressure switch.
6. Install the coolant reservoir.
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • You smell fuel, burning insulation, or see smoke.
  • Brakes feel soft, pull hard to one side, or make grinding noises.
  • The engine overheats, stalls repeatedly, or misfires under load.
  • You are missing required tools, torque specs, or safe lifting equipment.
  • You are not confident in the next step or safety outcome.