Installation Procedure

1998 Chevrolet Metro L4-079 1.3L VIN 2 MFISECTION Installation Procedure

Description:






1. Install the SDM (1) into the vehicle, taking care to ensure that the arrow is pointing toward the front of the vehicle.
2. Install the SDM fasteners (3).
Tighten
Tighten the fasteners to 5.5 N.m (49 lb. in).
3. Install the electrical connector and install the Connector Position Assurance (CPA).
4. Install the center console.
5. Enable the SIR system. Refer to Enabling the SIR System.
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • You smell fuel, burning insulation, or see smoke.
  • Brakes feel soft, pull hard to one side, or make grinding noises.
  • The engine overheats, stalls repeatedly, or misfires under load.
  • You are missing required tools, torque specs, or safe lifting equipment.
  • You are not confident in the next step or safety outcome.