New Process Model 205

1988 Chevrolet V 10 P/U 4WD V8-350 5.7LSECTION New Process Model 205
Idler Shaft Locknut 150 ft. lbs.

Idler Shaft Cover Bolts 20 ft. lbs.

Yoke Locknut 150 ft. lbs.

Bearing Retainer Assembly Bolts 30 ft. lbs.

Power Takeoff Cover Bolts 15 ft. lbs.

Drain And Filler Plugs 30 ft. lbs.
RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • You smell fuel, burning insulation, or see smoke.
  • Brakes feel soft, pull hard to one side, or make grinding noises.
  • The engine overheats, stalls repeatedly, or misfires under load.
  • You are missing required tools, torque specs, or safe lifting equipment.
  • You are not confident in the next step or safety outcome.