Safety Warning
DIY auto repair can cause serious injury, fire, or vehicle damage. These guides are for informational purposes only. Always follow OEM torque specs, wear PPE, and consult a certified mechanic if you are unsure. You are solely responsible for your safety.
SYS.OK|MANUAL.DB● LIVE
HOMESERVICE MANUALSCHEVROLET1987CAMARO V8-350 5.7LPARTS AND LABORENGINE, COOLING AND EXHAUSTENGINELABOR TIMES
1987 Chevrolet Camaro V8-350 5.7L
Engine: Labor Times
1987 Chevrolet Camaro V8-350 5.7LSECTION Labor Times
| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes | |
| Replace | ||||
| Complete Assembly With Transfer of Parts | ||||
| Without Port Injection | 10.7 | 0.0 | B | Includes: Transfer All Fuel And Electrical Units. Does Not Include Transfer Of Optional Equipment. |
| With Port Injection | 11.5 | 0.0 | B | Includes: Transfer All Fuel And Electrical Units. Does Not Include Transfer Of Optional Equipment. |
| Note | ||||
| With AC, Add | 0.7 | 0.0 | B | |
| With Cruise Control, Add | 0.2 | 0.0 | B | |
| With Auto Trans, Add | 0.5 | 0.0 | B | |
| With PS, Add | 0.5 | 0.0 | B | Includes: Transfer All Fuel And Electrical Units. Does Not Include Transfer Of Optional Equipment. |
| With C.C.C., Add | 0.7 | 0.0 | B | Includes: Transfer All Fuel And Electrical Units. Does Not Include Transfer Of Optional Equipment. |
| Complete Assembly Without Transfer of Parts | ||||
| Without Port Injection | 6.1 | 0.0 | B | Does Not Include: Transfer Of Any Part Of Engine Or Replacement Of Optional Equipment. |
| With Port Injection | 6.9 | 0.0 | B | Does Not Include: Transfer Of Any Part Of Engine Or Replacement Of Optional Equipment. |
| Note | ||||
| With AC, Add | 0.7 | 0.4 | B | |
| With Cruise Control, Add | 0.2 | 0.1 | B | Does Not Include: Transfer Of Any Part Of Engine Or Replacement Of Optional Equipment. |
| With PS, Add | 0.5 | 0.3 | B | Does Not Include: Transfer Of Any Part Of Engine Or Replacement Of Optional Equipment. |
| With Auto Trans, Add | 0.5 | 0.3 | B | Does Not Include: Transfer Of Any Part Of Engine Or Replacement Of Optional Equipment. |
| With C.C.C., Add | 0.7 | 0.4 | B | Does Not Include: Transfer Of Any Part Of Engine Or Replacement Of Optional Equipment. |
| Long Block | ||||
| Without Port Injection | 15.7 | 0.0 | B | Includes: R&R Engine And Transfer All Necessary Components Not Supplied With Long Block. |
| With Port Injection | 16.5 | 0.0 | B | Includes: R&R Engine And Transfer All Necessary Components Not Supplied With Long Block. |
| Note | ||||
| With AC, Add | 0.7 | 0.0 | B | Includes: R&R Engine And Transfer All Necessary Components Not Supplied With Long Block. |
| With PS, Add | 0.5 | 0.0 | B | Includes: R&R Engine And Transfer All Necessary Components Not Supplied With Long Block. |
| With C.C.C., Add | 0.7 | 0.0 | B | Includes: R&R Engine And Transfer All Necessary Components Not Supplied With Long Block. |
| Short Block | ||||
| Without Port Injection | 20.2 | 0.0 | A | Includes: R&R Engine & Transfer All Necessary Equipment. |
| With Port Injection | 21.0 | 0.0 | A | Includes: R&R Engine & Transfer All Necessary Equipment. |
| Note | ||||
| With AC, Add | 0.7 | 0.0 | A | Includes: R&R Engine & Transfer All Necessary Equipment. |
| With PS, Add | 0.5 | 0.0 | A | Includes: R&R Engine & Transfer All Necessary Equipment. |
| To Grind Valves, Add | 3.2 | 0.0 | A | Includes: R&R Engine & Transfer All Necessary Equipment. |
| With Auto Trans, Add | 0.5 | 0.0 | A | Includes: R&R Engine & Transfer All Necessary Equipment. |
| With Cruise Control, Add | 0.2 | 0.0 | A | Includes: R&R Engine & Transfer All Necessary Equipment. |
| With C.C.C., Add | 0.7 | 0.0 | A | Includes: R&R Engine & Transfer All Necessary Equipment. |
| Overhaul/Rebuild | ||||
| Complete Assembly | ||||
| Without Port Injection | 28.2 | 0.0 | A | Includes: Measure Cylinder Bores, Crankshaft & Pistons For Proper Size & Hone Cylinders. Renew Pistons Rings, Pins, Main & Rod Bearings. Grind Valves And Tune Up. |
| With Port Injection | 29.0 | 0.0 | A | Includes: Measure Cylinder Bores, Crankshaft & Pistons For Proper Size & Hone Cylinders. Renew Pistons Rings, Pins, Main & Rod Bearings. Grind Valves And Tune Up. |
| NOTE | ||||
| With AC, Add | 0.7 | 0.0 | A | Includes: Measure Cylinder Bores, Crankshaft & Pistons For Proper Size & Hone Cylinders. Renew Pistons Rings, Pins, Main & Rod Bearings. Grind Valves And Tune Up. |
| With Cruise Control, Add | 0.2 | 0.0 | A | Includes: Measure Cylinder Bores, Crankshaft & Pistons For Proper Size & Hone Cylinders. Renew Pistons Rings, Pins, Main & Rod Bearings. Grind Valves And Tune Up. |
| With Auto Trans, Add | 0.5 | 0.0 | A | Includes: Measure Cylinder Bores, Crankshaft & Pistons For Proper Size & Hone Cylinders. Renew Pistons Rings, Pins, Main & Rod Bearings. Grind Valves And Tune Up. |
| With PS, Add | 0.5 | 0.0 | A | Includes: Measure Cylinder Bores, Crankshaft & Pistons For Proper Size & Hone Cylinders. Renew Pistons Rings, Pins, Main & Rod Bearings. Grind Valves And Tune Up. |
| With C.C.C., Add | 0.7 | 0.0 | A | Includes: Measure Cylinder Bores, Crankshaft & Pistons For Proper Size & Hone Cylinders. Renew Pistons Rings, Pins, Main & Rod Bearings. Grind Valves And Tune Up. |
RENDER: 1.0x
NO RELATED
Recommended Tools & Savings
Use the Manual With the Right Hardware
Pair factory procedures with proven DIY tools so the instructions are easier to execute.
Affiliate disclosure: We may earn a commission at no extra cost to you.
When to See a Mechanic
Stop DIY work and contact a certified mechanic immediately if any of the following apply:
- • You smell fuel, burning insulation, or see smoke.
- • Brakes feel soft, pull hard to one side, or make grinding noises.
- • The engine overheats, stalls repeatedly, or misfires under load.
- • You are missing required tools, torque specs, or safe lifting equipment.
- • You are not confident in the next step or safety outcome.