Idle/Throttle Speed Control Unit: Testing and Inspection

Need a step-by-step guide?

Get an AI-powered repair guide with parts lists, cost estimates, and clear instructions for your Chevrolet hyperlink.

AI Repair Guides
Revenue RailIntent: manual

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

Fig. 031 - Chart C-2A Idle Speed Control (ISC) Check.:






1. ECM functional test--ECM should cycle ISC in both directions when the test terminal is grounded.
2. ISC plunger functional test--light should go ON when plunger is depressed.
3. Voltage should be near battery voltage.
- Checks for open in circuit to ISC.
- Low or no voltage indicates an open to the ECM, faulty ECM or poor ground.
4. Manually applies voltage to the ISC motor to determine if fault is in motor.
5. Checks for faulty P/N switch circuit.
- In park or neutral, voltage is normally low.
- In drive ranges voltage goes to near battery voltage.